MCP Hub
Back to servers

taskdog-mcp

Local-first task management with CLI, TUI, and REST API. MCP server enables Claude to manage tasks, track time, optimize schedules, and handle dependencies.

glama
Stars
204
Forks
10
Updated
Apr 14, 2026
Validated
Apr 15, 2026

Taskdog

CI PyPI License: MIT Python Version

A task management system with CLI/TUI interfaces and REST API server, featuring time tracking, schedule optimization, and beautiful terminal output.

Designed for individual use. Stores tasks locally in SQLite database.

https://github.com/user-attachments/assets/47022478-078d-4ad9-ba7d-d1cd4016e105

TUI (Textual)

TUI

Gantt Chart (CLI)

Gantt Chart

Try It Out

Try taskdog with ~50 sample tasks. No installation required — just Docker:

docker run --rm -it ghcr.io/kohei-wada/taskdog:demo

The TUI works inside the container, but some keybindings (e.g., Ctrl+P for command palette) may conflict with Docker's key sequences. For the best experience, run the server in a container and connect from your host:

docker run --rm -d -p 8000:8000 --name taskdog-demo ghcr.io/kohei-wada/taskdog:demo

# Wait for the server and demo data to be ready (~15s)
docker logs -f taskdog-demo 2>&1 | grep -m1 "Server ready"

uvx --from taskdog-ui taskdog tui

uvx comes with uv. It runs the command in a temporary environment without installing anything.

Installation

Requirements: Python 3.12+, uv

Supported Platforms: Linux, macOS

Recommended (with systemd/launchd service)

git clone https://github.com/Kohei-Wada/taskdog.git
cd taskdog
make install

This installs the CLI/TUI and server, and sets up a systemd (Linux) or launchd (macOS) service so the server starts automatically.

From PyPI

pip install taskdog-ui[server]

You'll need to manage the server process yourself (e.g., taskdog-server &).

Usage

taskdog add "My first task" --priority 10
taskdog table
taskdog gantt
taskdog tui

For complete setup including API key configuration, see Quick Start Guide.

Features

  • Multiple Interfaces: CLI, full-screen TUI, and REST API
  • Schedule Optimization: 9 algorithms (greedy, genetic, monte carlo, etc.)
  • Time Tracking: Automatic tracking with planned vs actual comparison
  • Gantt Chart: Visual timeline with workload analysis
  • Task Dependencies: With circular dependency detection
  • Markdown Notes: Editor integration with Rich rendering
  • Audit Logging: Track all task operations
  • MCP Integration: Claude Desktop support via Model Context Protocol

Architecture

UV workspace monorepo with five packages:

PackageDescriptionPyPI
taskdog-coreCore business logic and SQLite persistencePyPI
taskdog-clientHTTP API client libraryPyPI
taskdog-serverFastAPI REST API serverPyPI
taskdog-uiCLI and TUI interfacesPyPI
taskdog-mcpMCP server for Claude DesktopPyPI

Documentation

Contributing

Contributions are welcome! See CONTRIBUTING.md for guidelines.

License

MIT License - see LICENSE for details.

Reviews

No reviews yet

Sign in to write a review